05-06-2005, 09:13 AM
The customer had double what i had in mind!
Ok went to bid on a job. Renovate about 200sqft of beds and plant a few boxwoods.
Lady already had tons of material. I was thinking about 3 hours in my head. they wernt that bad. had to change one dripper head. I had 150-175 in my head including installing 2.5 yards of mulch she had. she said last guy was 300 without the mulch and offered 350 with me installing it. DEAL. took me about 3.5 to 4 hours with a lunch break under a oak tree.
ok was i way underpriced ? was he way over ? should I have taken it ? shes sooooo happy with the work I did and I even came back to remove 2 daylillies she wanted out. It was a bit further than I normally go but it was a special refferal.
comments ? price ????
Ok went to bid on a job. Renovate about 200sqft of beds and plant a few boxwoods.
Lady already had tons of material. I was thinking about 3 hours in my head. they wernt that bad. had to change one dripper head. I had 150-175 in my head including installing 2.5 yards of mulch she had. she said last guy was 300 without the mulch and offered 350 with me installing it. DEAL. took me about 3.5 to 4 hours with a lunch break under a oak tree.
ok was i way underpriced ? was he way over ? should I have taken it ? shes sooooo happy with the work I did and I even came back to remove 2 daylillies she wanted out. It was a bit further than I normally go but it was a special refferal.