PDA

View Full Version : Holding the Pattern


clarcon
07-19-2005, 07:33 PM
I am wondering if it is possible, without too much extra cutting of pavers and with holding to some pretty tight joint tolerances, to hold a 45 degree herringbone pattern as it winds through a curve filled sidewalk. The tightest radius is 28'-6"' on the prints. It seems to me that the pattern would be as if the whole area was filled solid as a patio and the walk was carved out of it. Any help would be greatly appreciated.

Craig Clark
Clark Construction

mbella
07-19-2005, 08:06 PM
You are right. You need to layout and overlay the perimeter of your walk. After overlaying, draw your curves on the overlaid pavers and cut.