PDA

View Full Version : Need help pricing preping soil & seeding waterline


lawnservices
04-08-2001, 11:26 PM
I am easing my way into bidding a job of repairing turf after a 9.3 mile waterline was installed. I am responsible for removing rocks and raking out soil. Disposing of rocks, seeding, straw and fertilizing. I realize that many varibles dictate this pricing. Ballpark pricing for seeding/straw per square foot. Pricing for running a rockhound and preping soil per square foot or per 1000. It is said that finish grade will be completed by excavator.

paul
04-09-2001, 12:36 AM
We figure it by the Sq. yd. most times it's $1.25 to $1.50.

greens1
04-11-2001, 01:52 AM
Pauls price seems about right. The only thing to watch out for is the " finish grade by excavator ". With an excavator youu may be (+ or -) 2 feet and need to run a boxblade over the site.
Good Luck,
Jim L