The delivery truck while dumping a load of modified backing onto the escavated area of the patio (in one section). The soil is heavy clay and we had had some rain. In short, I now have 2 10-12" ruts where the truck went too far ( we were dumpin on one side and moving to the other side of the patio area by hand. What's the best thing to do at this point.

1) line w/ fabric in the ruts, fill with modified, then line over top of the 'new' flat surface?
2)just fill with 2A until compacted flat , then fabric and move on?
3) ?

When finished (if the truck hadn't done this), the base would be 10"

Any thoughts would be appreciated.

Thanx

tawolcott
04-23-2006, 09:13 PM
Weak site .

Pavers Plus
04-23-2006, 09:56 PM
I think if it was me, I'd line the rut with stabilizing fabric, then fill with 3/4 stone (#57 stone) to get back to grade. Then go ahead with your normal stabilizing fabric / Modified stone installation.

What may end up happening if you use the same modified gravel in the rut as the rest of the base is you may encounter varied freeze/thaw conditions in the deeper area of modified........

hope this helps.