PDA

View Full Version : London Rain ride along on a service day...


londonrain
10-09-2007, 10:23 PM
Just a few pics from my travels today which is a typical service day for me.
1st stop of the day.
Drip filter blew the top off because the box was caving in and pushed the top off. The drip filter is on the pressure side of the valve. Master valve on system so only leaked when a zone was running.
http://webpages.charter.net/nixdiecast/lr1.jpg
Easy repair with out digging the entire box up right next to a driveway was cut notch out for filter.
http://webpages.charter.net/nixdiecast/lr2.jpg
2nd stop was locate weeping zone valve. Used 521 and located 10" valve box under 6" of soil. Replaced a Toro 250 with hairline crack and replaced 3 Toro super 700's on this stop.
http://webpages.charter.net/nixdiecast/lr3.jpg
We dont see many 1 1/4" lines so I had to get creative with a 1 1/4" slip fix and a few other fittings....
http://webpages.charter.net/nixdiecast/lr4.jpg

3rd stop was back-flow test
http://webpages.charter.net/nixdiecast/lr5.jpg
4th stop was another back-fow test
http://webpages.charter.net/nixdiecast/lr6.jpg
5th stop another back-flow test...using vertical tube.
http://webpages.charter.net/nixdiecast/lr7.jpg
6th stop was a system we installed in 96's and this is the first time back since we installed the system.
Rain Bird ESP8 master valve post stopped working so pump would not fire up.
http://webpages.charter.net/nixdiecast/lr8.jpg

http://webpages.charter.net/nixdiecast/lr9.jpg
Replaced with a Hunter SRC controller...

http://webpages.charter.net/nixdiecast/lr10.jpg
Pump after 11 years....there is a pad poured under the pump and the homeowner built a little house for the pump...pump still looks good after 11 years.

http://webpages.charter.net/nixdiecast/lr11.jpg
PGP's still running.....

http://webpages.charter.net/nixdiecast/lr12.jpg
7th stop was for another controller replacement...
Optima in a old Toro cabinet...


http://webpages.charter.net/nixdiecast/lr13.jpg

Pro-c outdoor installed


8th stop was for a leak on a lateral line and water company busted the HO for no back-flow.



http://webpages.charter.net/nixdiecast/lr14.jpg
Water was connected under the house and valve box was right outside the foundation with a ball valve, only place was under the house.

http://webpages.charter.net/nixdiecast/lr15.jpg
9th stop was moving a head, nice red clay we have.

http://webpages.charter.net/nixdiecast/lr16.jpg
All cleaned up...
http://webpages.charter.net/nixdiecast/lr17.jpg
10th stop was replace 1 head.....PGM out RB 5000 in....
http://webpages.charter.net/nixdiecast/lr18.jpg
11th and final stop was back at the 2 wire repair job and now the MV/pump decoder quit working. Jumped wires from decoder #1 to the pump start relay and pump fired up with #1 so I know the MV/pump decoder went bad...and the pump and pump start relay are still good.


That is a day with London Rain on a service day.

FIMCO-MEISTER
10-09-2007, 10:31 PM
I'm guessing 11 hours of billing and 2100 gross sales?

londonrain
10-09-2007, 10:35 PM
I'm guessing 11 hours of billing and 2100 gross sales?
lol started at 9:00am and finished at 6:00pm...no lunch and we did stop at the supply house also.....

FIMCO-MEISTER
10-09-2007, 10:37 PM
Actually I redid it. Assuming you do .5 billing
1 first
1.5 second
.5
.5
.5
1clock
1clock
1.5bcflw install
1moving head
.5 replacing head
8.5 hours billing not including the two wire

londonrain
10-09-2007, 10:46 PM
That is a repairmans eye Peter, here is my actual charges per stop....

1 first - $60..00
1.5 second -$365.00
.5 -$45.00
.5 - $45.00
.5 - $45.00
1clock - $250.00
1clock - $295.00
1.5bcflw - install $225.00
1moving head - $60.00
.5 replacing head - $95.00
8.5 hours billing not including the two wire - $50.00

FIMCO-MEISTER
10-10-2007, 06:05 AM
I'd take a day like that everyday.

CAPT Stream Rotar
10-10-2007, 06:47 AM
I'd take a day like that everyday.


Same here...

Great pics london..
I tell you a few miles south and EVERYTHING is different....

Nice clean up.

Mike Leary
10-10-2007, 05:01 PM
You ever lose any tools or employees in that gumbo? I'm assuming the
bricks in the DCVA pic are to block it.:)

Flow Control
10-10-2007, 06:18 PM
1 man service day or two. Sounds like a good days worth of work. Prob a couple 100 in material. What's the list price on that backflow?