lehrjetmx
04-23-2008, 09:04 AM
Got to a start up yesterday and as I walked up to the owner he tells me "Have a little mess in the backyard." We did our usual:
install the plug
turn on the well
and move to the clock.
With all that said then turned to the owner what is the mess. He tells me that they took out a few heads to install a hot tub. Ok no big deal we go to look at it and wholly cow its a mess of wires, poly pipe, funny pipe and pvc not to mention a valve and heads. Turned to the guys told them to shut the system OFF. Customer cut the pump relay wires, the valve wires, the main feed off the pump and a small mainfold. He did in fact take out a few heads and as far as the little mess well we have to discuss that!!!!!!! Have to down load the pictures but all in all it took us 2.5 hrs to get the system back up and running minus 1 zone. Told the owner we will see next week to tie the missing zone back in.
install the plug
turn on the well
and move to the clock.
With all that said then turned to the owner what is the mess. He tells me that they took out a few heads to install a hot tub. Ok no big deal we go to look at it and wholly cow its a mess of wires, poly pipe, funny pipe and pvc not to mention a valve and heads. Turned to the guys told them to shut the system OFF. Customer cut the pump relay wires, the valve wires, the main feed off the pump and a small mainfold. He did in fact take out a few heads and as far as the little mess well we have to discuss that!!!!!!! Have to down load the pictures but all in all it took us 2.5 hrs to get the system back up and running minus 1 zone. Told the owner we will see next week to tie the missing zone back in.