andy'slawncare
04-23-2008, 10:32 PM
I had a local business call today to do a mulch project to their property. I have a few picture attached. They want the 4x4 taking out along with the red rock and replaced with a circle shape around the trees and mulch installed. Also there are two sections of plants that they wanted trimmed back and the boards/ rock removed, also there replaced with mulch. The last section of the project is to remove rock and boards around a building and replaced with mulch also. I figure it will take about 16 yards of mulch and about the same amount of rock has to be removed. Any idea of or how long it will take a 3 man crew to finish it. I have done smaller mulch jobs but nothing really this big. Thanks for your help!