Jimbo
02-18-2002, 10:08 PM
Please help!
I need to get a price recommendation on a few propertys that I have the chance to quote on for 2002.
A. 1 Acre commercial lot. Flat with a few trees, but rough weeds
and some sticks and stones. I expect first and or all cuts to be
made with a high speed tractor pulled rotary mower. 1 or 2 cuts
per month. Finish trim around trees and road with hand held
trimmer.
(30 min. from headquarters)
B. 1.5 Acre commercial lot. On 20 degree incline with several dips
and a few rock piles. 3/4 can be cut with Tractor pulled rotary
and the rest will need to be cut with hand held trimmer. 1 or 2
cuts per month.
(20 min. from headquarters)
C. 2 Acres along a highway. 60 degree incline which can only be
cut with hand held trimmer. I can bust hump and cut this in 3.5
hours, but its a back breaker with my modified sthil trimmer.
Cut twice a month. (20 min from Headquaters)
All Jobs one man on site!
Any advice on hourly pricing or by job would be appreciated. Until
now I have just under bid the lowest bidder, but I need to get my act together and have a proper formula for bids.
I need to get a price recommendation on a few propertys that I have the chance to quote on for 2002.
A. 1 Acre commercial lot. Flat with a few trees, but rough weeds
and some sticks and stones. I expect first and or all cuts to be
made with a high speed tractor pulled rotary mower. 1 or 2 cuts
per month. Finish trim around trees and road with hand held
trimmer.
(30 min. from headquarters)
B. 1.5 Acre commercial lot. On 20 degree incline with several dips
and a few rock piles. 3/4 can be cut with Tractor pulled rotary
and the rest will need to be cut with hand held trimmer. 1 or 2
cuts per month.
(20 min. from headquarters)
C. 2 Acres along a highway. 60 degree incline which can only be
cut with hand held trimmer. I can bust hump and cut this in 3.5
hours, but its a back breaker with my modified sthil trimmer.
Cut twice a month. (20 min from Headquaters)
All Jobs one man on site!
Any advice on hourly pricing or by job would be appreciated. Until
now I have just under bid the lowest bidder, but I need to get my act together and have a proper formula for bids.