PDA

View Full Version : E Track tie down system


milsaps118
04-07-2009, 02:52 PM
I'm looking to add an E-Track system in my enclosed. Right now I have 6 D-rings on the floor and sometimes find it a PITA to strap things down depending on what and how I have it loaded.

Where is the best location to attach the track, on the walls or the floor up against the wall?

seabee1
04-07-2009, 11:31 PM
depends how much weight your holding ,the walls wont hold a tremendous amount the floor might hold more better get underneath it to see were you can tie into .better to steel with 16" centers for strength .the side posts wont hold a lot ,just alumanum and galvanized zee posts on the side's.

Brett's Cutting Edge
04-08-2009, 12:42 PM
I put the etrack in my trailer i put it in front for blowers and what not but dont find a reason to tie down my ztrs they have never moved around on me.