edmonton01
06-13-2009, 04:52 PM
I poured concrete yesterday (Friday) for my driveway. It had hardened enough to walk on before I could put a control joint in while wet. It's 22 ft. long 10 ft wide. Can I still put in a joint without cracking the cement? Thanks for the imput.

Duffster
06-13-2009, 05:15 PM
It should have been done by now.

Bru75
06-13-2009, 11:42 PM
You can saw a joint.

Beartooth
06-14-2009, 11:15 AM
I agree, cut in the contol joint w/ a demo saw.

Duffster
06-14-2009, 04:03 PM
It probably already cracked:(

edmonton01
06-14-2009, 07:10 PM
My dilemma is I still have another side to pour; actually 2 (opposite side 10' x 22', then a 3' x 20' because of how the slope of the yard ). I'd like it to look as uniform as possible. I messed up my wrist and should take a week off to let it mend. What do you guys think? Thanks in advance for answering...

edmonton01
06-14-2009, 07:12 PM
It probably already cracked:(
by the way Duffster, I have been continuously watering the pad and so far it has not cracked. But of course that does not mean it won't in the future.

Duffster
06-14-2009, 10:28 PM
by the way Duffster, I have been continuously watering the pad and so far it has not cracked. But of course that does not mean it won't in the future.

You usually can't see them at first