Alright so after countless hours of prep and figuring specs and materials, my first retaining wall job is set for next thurs. The wall itself will only be about 50' long with two c curves at each end going into the hill, only 3' tall for the just of it
The jobs calls for this
-demo of existing timber wall
- grading area to left where wall was but new wall will not cover
- excavate back about 2'
- dig trench 1' deep to allow 6'' compacted class 5, fabric and first level of block
- drain tile along w/ 2 daylights
- 18" 3/4 clear behind wall
- we will be using umber beveled diamond block (customer likes this best, also has some of this scattered throughout the existing landscape)
First you should know this is my girlfriends parents house and they are letting me do this as they needed it done and want me to get experiance
We will be demoing the old wall with the skid steer and a helper with a sledge if needed, also will be excavating back 2' with the skidsteer
My question is, we already own the skid steer but will be renting either a mini EX or a dingo for the 1' excavation for the trench. I know its only 50' long and could probly be hand dug but id like to get experiance with using machines to dig it since most projects would call for one.
What do you guys think... Can i get a away with using a mini skid? Should i use a mini ex hands down? The one problem i see with using the mini ex other then the price is having a 3' soil wall directing to the one of the side of the trench, i think it will get in the way of digging and i will have to end up digging it at an angle with the mini ex compared to a mini skid where i can just come in from the side
all criticism with my planning is helpfull.... let me have it!
By the way the soil is a pretty heavy clay which is why im taking all the precautions with drain tile, 1 layer block under soil line and geo tex
Also is there a certain type of fabric i should be using? i know not to use regular landscape fabric but what kind of weave am i looking for?
thanks for reading my wall of text...
The jobs calls for this
-demo of existing timber wall
- grading area to left where wall was but new wall will not cover
- excavate back about 2'
- dig trench 1' deep to allow 6'' compacted class 5, fabric and first level of block
- drain tile along w/ 2 daylights
- 18" 3/4 clear behind wall
- we will be using umber beveled diamond block (customer likes this best, also has some of this scattered throughout the existing landscape)
First you should know this is my girlfriends parents house and they are letting me do this as they needed it done and want me to get experiance
We will be demoing the old wall with the skid steer and a helper with a sledge if needed, also will be excavating back 2' with the skidsteer
My question is, we already own the skid steer but will be renting either a mini EX or a dingo for the 1' excavation for the trench. I know its only 50' long and could probly be hand dug but id like to get experiance with using machines to dig it since most projects would call for one.
What do you guys think... Can i get a away with using a mini skid? Should i use a mini ex hands down? The one problem i see with using the mini ex other then the price is having a 3' soil wall directing to the one of the side of the trench, i think it will get in the way of digging and i will have to end up digging it at an angle with the mini ex compared to a mini skid where i can just come in from the side
all criticism with my planning is helpfull.... let me have it!
By the way the soil is a pretty heavy clay which is why im taking all the precautions with drain tile, 1 layer block under soil line and geo tex
Also is there a certain type of fabric i should be using? i know not to use regular landscape fabric but what kind of weave am i looking for?
thanks for reading my wall of text...