MOW ED
04-21-2003, 05:22 PM
I have a 300 sq ft area that measures aprox. 55 x 5 that must be raised up 2" as it sits. It has grass on it now.
I am thinking of cutting the sod out and raising the grade. I think it will be aprox 4" low after sod is cut but I am not sure.
The area is a strip that runs the length of a driveway and a walkway that has settled 2 inches.
How much black dirt do I need to fill it and make it right. I plan to overseed it after I raise it.
I am new at this and need a little help.
I also have about 2500 sq ft to rip up and overseed at the same place. How much dirt will I need in addition to above. thanks.
ed
I am thinking of cutting the sod out and raising the grade. I think it will be aprox 4" low after sod is cut but I am not sure.
The area is a strip that runs the length of a driveway and a walkway that has settled 2 inches.
How much black dirt do I need to fill it and make it right. I plan to overseed it after I raise it.
I am new at this and need a little help.
I also have about 2500 sq ft to rip up and overseed at the same place. How much dirt will I need in addition to above. thanks.
ed