mbs
09-18-2003, 12:55 PM
this is my second walkway its about 70sf 3' wide. im figuring labor will take about a day1/2 but im gonna say 2 1/2 days @ 1,200. materals and existing flagstone plus a couple extra pieces im figuring is about $175. in all im thinking $1500 for every thing. if they decide to go with pavers im thinking an extra $200 pavestone holland @ 2.05 sf. $1700 does this sound right? thanks