CRUZMISL
09-23-2004, 10:03 AM
I need to add 3 more zones. I essentially have to take some heads off of some zones and add them to the new ones in order to get adequate flow from the pipe that supplies my house. I'm over 10GPM on some zones and while the sprinklers work I think I could get better coverage if I were able to bring it closer to 7GPM (3/4 inch copper supply).
I have to run about 200ft of poly pipe. I could dig by hand and try to avoid the existing lines but that would take hours in a hard clay soil. Alternatively, I could rent a trencher and make quick work of the trench but then I would have to go back and repair all the existing poly I severed. What would be the best approach? Also, I was thinking about renting a sod cutter too, that way I don't have to try and cobble pieces of sod together when I'm done.
Any thoughts?
Thanks,
JOE
I have to run about 200ft of poly pipe. I could dig by hand and try to avoid the existing lines but that would take hours in a hard clay soil. Alternatively, I could rent a trencher and make quick work of the trench but then I would have to go back and repair all the existing poly I severed. What would be the best approach? Also, I was thinking about renting a sod cutter too, that way I don't have to try and cobble pieces of sod together when I'm done.
Any thoughts?
Thanks,
JOE