View Single Post
  #3  
Old 06-11-2001, 11:31 PM
greens1 greens1 is offline
LawnSite Senior Member
 
Join Date: Mar 2001
Location: Grosse Pointe, MI
Posts: 352
If it's poly pipe you use a barbed coupling and crimp clamps. If it's schedual pipe then you use a pressure coupling.

Electrolisis only occurs with metal to metal contact. If you go plastic to metal there is no problem, other than the fact that you are making life difficult for yourself.

Good Luck,
Jim L
__________________
The harder I work
the luckier I get.
Reply With Quote
 
Page generated in 0.04121 seconds with 7 queries