this took me and another guy about 5 weekends. sat/sun
1. grade out remove five trees. ////weekend 1
2. run sprinkler line from front yard to back, lay pipes. ////weekend two
3. wall and concrete. one very long weekend. ////wekend three
4.lay all rock////weekend five.
5. lay sod drink beer weekend six
almost. 10 days. not bad in my opinion.
the pot is a water feature, plants will be planted in the spring. 100% irrigated.
any feedback is welcom good and bad. just keep in mind that my wife designd the layout for our kids to play on all 4 of em!!