|
i work solo using a br400, little wonder with 9 hp honda, lazer z, and a scag 48 inch with bagger. i can do two full cleanups a day. a few times ive been able to start a third, but thats about as productive as i can be. i want to put a bagging system on the lazer so things go a little easier. most cleanups take me 3-4 hours.
__________________
Matt
"Lifes a garden, dig it"
|