View Single Post
  #2  
Old 08-10-2008, 05:57 PM
foreplease's Avatar
foreplease foreplease is offline
LawnSite Bronze Member
 
Join Date: May 2008
Location: St. Joseph, MI
Posts: 1,255
Just to be safe, I put in a smile drain at the front and back edges of mound
Name:  smile drain at mound_low res.jpg
Views: 1910
Size:  173.3 KB
The school had about 3 dozen old bricks, we put those on the bottom layer
Name:  IMG_2284_crop_low res.jpg
Views: 1895
Size:  67.2 KB
I made this mound gauge that made the job easier and, probably, better The landing area is two bricks deep
Name:  IMG_2287_low res.jpg
Views: 1893
Size:  110.3 KB
Building and following the slope one brick deep
Name:  IMG_2288_low res.jpg
Views: 1889
Size:  108.2 KB
All of the heavy use area in front of the rubber is three bricks deep
Name:  IMG_2289_low res.jpg
Views: 1883
Size:  111.7 KB

continued...
Reply With Quote
 
Page generated in 0.03999 seconds with 8 queries