View Single Post
  #22  
Old 06-19-2009, 10:03 AM
Spilllight Spilllight is offline
LawnSite Member
 
Join Date: Apr 2009
Location: Nashville, TN
Posts: 23
Connecting 10-12g LV wires to smaller gauge wires on the control device. Sometimes in the terminal connection there are several wires. Depending on the zone there could be more load than the control device can handle for a single "ON". Maybe I'm missing something.
Reply With Quote
 
Page generated in 0.03865 seconds with 7 queries