View Single Post
  #5  
Old 08-08-2010, 02:11 AM
WalkGood WalkGood is offline
LawnSite Bronze Member
 
Join Date: Jun 2006
Location: Long Island, NY
Posts: 1,910
I've never had to put more than two lines in a "trench" (I do not have trenches per se, since this is pulled poly land). If you have more than 2 lines in a trench then you just need one line that leads to a new manifold for the 3 or more zones.

Manifolds save wire, and wire related problems.

::stands back, sits down with bucket of popcorn::
Reply With Quote
 
Page generated in 0.03363 seconds with 7 queries