Thread: seriously.
View Single Post
  #18  
Old 09-09-2010, 08:57 PM
Hardscaping Hardscaping is offline
LawnSite Senior Member
 
Join Date: Aug 2008
Location: southern ontario
Posts: 359
Quote:
Originally Posted by wurkn with amish View Post
Ok,
if there's nothing wrong with the base, fix the couple of low spots clean the cracks with a pressure washer the resand with poly. No reason to take up the whole thing. Now if the joints are widening then your wrong and you need to reevaluate the project.

Now that you said this i can see how the guys are able to do the job for under 20 grand. they are not taking it all up, there is no way they are. they must only be taking up enough to do border and washing out the joints, and resanding with poly. only removing interlock from the few spots that are low and fixing those areas.

i am going to call him and ask him this, because if this is the case then i can get to the same area as the other guys. Thanks for opening my eyes on that.
Reply With Quote
 
Page generated in 0.04233 seconds with 7 queries