View Single Post
  #4  
Old 09-16-2010, 09:33 AM
Grass Shark's Avatar
Grass Shark Grass Shark is offline
LawnSite Senior Member
 
Join Date: Aug 2009
Location: Zone 7
Posts: 662
Quote:
Originally Posted by A1lawncaredfw View Post
anywhere from 15 - 20 minutes this includes the time from opening tailgate till it's closed 3 man crew, sorry for the misunderstanding I mean 10k lot including building/home. These are 10K per lot 1 duplex in otherwords 5K per unit.
15 minutes to do 10k of turf with a 21"? Are you sprinting?
If you are right than I wasted thousands of dollors on zero turns. I have on lot that is a 10K and I spend 9-12 minutes on every week with a 52" Z
__________________
1999 F250 Diesel
2000 F350 Dump
16Ft Enclosed Trailer
10Ft Dump Trailer
12Ft Leaf Box Billy Goat
60" Exmark Lazer Z
52" Hustler Mini Z
44" Toro Z Master
36" Bunton WB
21" Honda WB
Redmax & Stihl Handhelds
Bunch of other crap!!
Reply With Quote
 
Page generated in 0.04026 seconds with 7 queries