View Single Post
  #116  
Old 11-17-2010, 01:12 PM
DanaMac's Avatar
DanaMac DanaMac is offline
LawnSite Fanatic
 
Join Date: Mar 2002
Location: Somewhere in the state of CO
Posts: 13,032
Quote:
Originally Posted by Wet_Boots View Post
Piker winterizing with a dinky compressor. Remove the end riser's nozzle to speed up the operation.
On some systems I will remove the last nozzle on the zone. Primarily zones that are on the narrow parkway strip between the sidewalk and street. A lot of these heads tend to be 5', 8', or 10' nozzles. And they take quite a while to allow the water through due to gpm design. So removing the last nozzle speeds up operation.
Reply With Quote
 
Page generated in 0.04049 seconds with 7 queries