View Single Post
  #27  
Old 01-15-2011, 12:21 PM
john1066 john1066 is offline
LawnSite Member
 
Join Date: Oct 2010
Location: MA
Posts: 91
heres a bridge job that was my first job out of school

setting the beams


forming one of the abutments.


full depth reclamation of the road leading to the bridge


same thing


pouring the bridge deck.


digging caissons to guide the Hpiles there is an auger on the 304.5 they were only 8 feet deep.
Reply With Quote
 
Page generated in 0.03657 seconds with 7 queries