Thread: RWF, Inc.
View Single Post
  #1225  
Old 02-06-2011, 04:55 PM
joes169 joes169 is offline
LawnSite Member
 
Join Date: Aug 2010
Location: WI
Posts: 236
Quote:
Originally Posted by tthomass View Post
Shop is built on fill and these are piers for additional support of the slab to help prevent any potential settling. Concrete will be polished and 5-6" of 3500psi with fiber and rebar 24" OC. Floor will pitch to the center where we've got a drain for washing out the shop or what may come off of trucks/equip.
Sounds like a good plan, but don't forget to drain into a catch basin at some point so you have a place for sediment to drop. AND make sure the pipe is well below the frost line outside, I've had to thaw mine twice this winter already, and it's a real PITA.......
Reply With Quote
 
Page generated in 0.04725 seconds with 7 queries