Thread: RWF, Inc.
View Single Post
  #1302  
Old 02-26-2011, 09:09 AM
tthomass's Avatar
tthomass tthomass is offline
LawnSite Gold Member
 
Join Date: Jun 2006
Location: N. VA
Posts: 3,431
30x40 w/ 16' ceiling and truss roof. Single walkout door on the side and a 12x14' door. Electric is in the process and I don't know yet. It will be 7 weeks by the time the permits are done and everything hooked up. I'll have an electrician hang the box and prep for the electric company to put up their meter and then we'll probably wire the shop ourselves.

I used Pioneer Pole Buildings out of PA. Fast and did a good job.
Reply With Quote
 
Page generated in 0.04168 seconds with 7 queries