View Single Post
  #618  
Old 06-18-2011, 10:52 AM
Kiril Kiril is offline
LawnSite Fanatic
 
Join Date: Jun 2007
Location: District 9 CA
Posts: 18,318
Quote:
Originally Posted by IRRITECH View Post
True, but the concrete does not have to extend 2' from the post, and if for some reason it did, any professional contractor would have moved the pipe.
Any "professional" contractor wouldn't have backfilled against the post either. I would rather see a flared bottom on a deck support than the alternative. That said, the pipe should have been moved IMO.
Reply With Quote
 
Page generated in 0.03303 seconds with 7 queries