View Single Post
  #16  
Old 12-20-2011, 08:27 AM
AWJ Services AWJ Services is online now
LawnSite Platinum Member
 
Join Date: Jun 2004
Location: Ga
Posts: 4,155
Quote:
Originally Posted by bobcatexc View Post
I don't have to much time to comment on this, but mud won't stack with out being withheld someway, even come summer time the top 6" might look dry but you'll still have 2' to ?? who knows how much mud.

But to keep this simple your simply "In over your head on this one".
My thoughts exactly. If you removed 3 ft from the lake on average thats almost 60000 yards of material. Thats about 4000 dumptruck loads of material.

Or 70000+ buckets with a skid steer. or 280000 sccops with a mini ex. I hope your grease gun is ready!
Reply With Quote
 
Page generated in 0.04427 seconds with 7 queries