Originally Posted by 1toomanyhobbies View Post
Easy Tiger! If you read my original post I recommended either reducing the pond to 6 acres which at 3 feet deep is 9798 cubic yards or creating islands which say at 4 acres worth of island it goes to 13064.

If I go the island option i could create several smaller ones which reduces the distance needed to move the material. After sleeping on it I agree a mini and skid steer wouldn't be the right option. However i am now wondering what if I rent a 160 to 200 excavator to get the material from the edges to several rough piles and then use the skid steer/ mini to actually create the islands. I could even wait a couple weeks in between to give the piles a chance to dry out some depending on if the material is wet at 3 feet deep.
I just realized the amounts above are for 1 foot deep, not 3. So to remove the amount of dirt would be tripple the numbers. need more coffe in the morning.
Reply With Quote
 
Page generated in 0.03902 seconds with 7 queries