View Single Post
  #3  
Old 05-18-2012, 06:00 AM
FLCthes4:11-12 FLCthes4:11-12 is offline
LawnSite Senior Member
 
Join Date: Mar 2009
Location: N.E. Georgia
Posts: 281
In a nut shell here is how I do I do walks in GA. Excavate 7" from finish grade level, compact soil, geo textile fabric (wider than walk). 2" of crusher run compact, wet, compact, 2" more crusher run compact wet, compact. 1" screed rails (Steel conduit works well for me). I use m-10 quarry sand. Lay field pavers, mark curves cut while on ground with saw. Lay soilder course. Take a trowel or spade and cutt off excess sand on outside edge of soilder course. Install edging with a spike every 1' or so. Cover pavers with fine masonry sand 1/4" and compact (dont be scared).Sweep excess.
Reply With Quote
 
Page generated in 0.03758 seconds with 7 queries