View Single Post
  #4  
Old 05-18-2012, 07:58 AM
AztlanLC's Avatar
AztlanLC AztlanLC is offline
LawnSite Senior Member
 
Join Date: Jul 2001
Location: Highland, NY
Posts: 972
It's better to moist you base material before compacting, what we do is hose the entire pile and then spread it, let it soak the water for about an hour so is evenly.
Reply With Quote
 
Page generated in 0.03675 seconds with 7 queries