View Single Post
  #19  
Old 08-21-2012, 10:12 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
 
Join Date: Aug 2005
Location: County Jail
Posts: 5,816
Quote:
Originally Posted by alexschultz1 View Post
Dang i have always buried the first course. Now I can save some serious time on my next job!! there's always something to learn
We bury the first course too.

Again, just to make myself clear, if there are pavers butting up to the wall - then I may spec the work where the 1st course is not entirely buried as the pavers will keep the block from moving. This is based on the wall being no more than 30" in height.

For the folks that are reading this and that are new to this stuff - it's important to know the reason why block is typically set 1" into the ground for every 12-inches of wall height. And that reason is to keep the wall from sliding forward (down the hill). Note: Sliding and "rotating" are two different things


.
__________________
"It's You vs. You"

"People Throw Rocks At Things That Shine"


My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
 
Page generated in 0.03374 seconds with 7 queries