Thread: horse ring
View Single Post
  #1  
Old 09-05-2012, 08:39 PM
sven1277 sven1277 is online now
LawnSite Senior Member
 
Join Date: Mar 2008
Location: Gales Ferry, CT
Posts: 560
horse ring

A customer asked me to redo their horse ring. The customer owns a stable and trains horses and riders so they need it done properly. I'm not familiar the requirements for a proper horse ring and was just about to start researching and figured I would post the question here, too. The customer said there should be a top layer of a couple of inches of clean sand. I am tentatively thinking to dig it down a foot and spread a base layer of process 8-10" and fine grade that. Then spread a 2-3" layer of clean concrete or mason sand. Just wondering if anyone here has any insight. Thanks.
__________________
'05,08 Chevy 3500 Dump
00 Chevy 2500
61" Scag turf tigers
61" Wright zk
ASV SR 70
Takeuchi 135
Kubota 7610 40" rotadarion
20' enclosed 10k lawncare trailer
18' aluminum 12k equipment trailer
35hp Giant Vac leaf loader
Reply With Quote
 
Page generated in 0.04455 seconds with 7 queries