View Single Post
Old 09-11-2012, 06:00 PM
GreenI.A.'s Avatar
GreenI.A. GreenI.A. is offline
LawnSite Silver Member
Join Date: Jul 2010
Location: North East
Posts: 2,131
i was just recently watching a company do simular for walkways on a large park site at a college campus. They are laying probably 15k sq ft. From what I have noticed during the different stages it looks like they did a geotect on the compcted soil then there base like most of us do. But then they did the geotect and permuable pavers
Why do people not respect us as they do other tradesmen? Because every Tom, Dick, and Harry doesn't think he can be a plumber or electrician!
Reply With Quote
Page generated in 0.03562 seconds with 8 queries