View Single Post
  #4  
Old 09-11-2012, 06:00 PM
GreenI.A.'s Avatar
GreenI.A. GreenI.A. is offline
LawnSite Silver Member
 
Join Date: Jul 2010
Location: North East
Posts: 2,078
i was just recently watching a company do simular for walkways on a large park site at a college campus. They are laying probably 15k sq ft. From what I have noticed during the different stages it looks like they did a geotect on the compcted soil then there base like most of us do. But then they did the geotect and permuable pavers
__________________
Why do people not respect us as they do other tradesmen? Because every Tom, Dick, and Harry doesn't think he can be a plumber or electrician!
Reply With Quote
 
Page generated in 0.03736 seconds with 7 queries