View Single Post
  #23  
Old 09-27-2012, 08:34 PM
Darryl G Darryl G is offline
LawnSite Fanatic
 
Join Date: May 2001
Posts: 8,015
Be sure to get a deposit that at least coves the cost of materials before even scheduling a job.

Mark up all materials at least 15%.
Reply With Quote
 
Page generated in 0.03601 seconds with 8 queries