View Single Post
  #11  
Old 10-04-2012, 07:50 PM
muddywater muddywater is offline
LawnSite Bronze Member
 
Join Date: Sep 2011
Posts: 1,813
Well we installed 3000 shrubs for this phase. Ended up buying an echo ea-410 auger with a 10" bit for this job. I was hoping it would take one guy, but it still took two even though it is a smaller auger. Worked pretty well. 3000 shrubs in 3.5 days.
Attached Images
   
Reply With Quote
 
Page generated in 0.04428 seconds with 8 queries