Thread: Nasty one
View Single Post
  #12  
Old 10-05-2012, 03:14 PM
muddywater muddywater is offline
LawnSite Bronze Member
 
Join Date: Sep 2011
Posts: 1,813
Quote:
Originally Posted by txirrigation View Post
From my experience, concrete guys don't have the foresight to think about the next guy in line. Mainly because they are never called back to put sleeves in after the concrete is poured, they put that on the LOSS (last on site sub)
This contractor tied into laterals under the parking lot. He ran his new irrigation after the work was already done.

Ironic how the lowest bidder ends up being the most expensive.
Posted via Mobile Device
Reply With Quote
 
Page generated in 0.04223 seconds with 7 queries