Thread: Nasty one
View Single Post
  #15  
Old 10-05-2012, 07:32 PM
muddywater muddywater is offline
LawnSite Bronze Member
 
Join Date: Sep 2011
Posts: 1,813
Another photo from munchkinville. I subcontracted 450' of boring. A couple of the bores were 180' long. The technology of these drills is amazing. He hit a 2x2 area in a couple of the bores. He steered around a few footers, pretty amazing. This guy had some nice locating equipment as well. He had some sort of radar that allowed him to see how deep a 8" water main was. He said the radar cost 9-10k.
Attached Images
 
Reply With Quote
 
Page generated in 0.03743 seconds with 8 queries