Thread: Nasty one
View Single Post
  #16  
Old 10-05-2012, 07:23 PM
greenmonster304's Avatar
greenmonster304 greenmonster304 is offline
LawnSite Silver Member
 
Join Date: Jul 2007
Location: You Know
Posts: 2,376
Quote:
Originally Posted by muddywater View Post
Another photo from munchkinville. I subcontracted 450' of boring. A couple of the bores were 180' long. The technology of these drills is amazing. He hit a 2x2 area in a couple of the bores. He steered around a few footers, pretty amazing. This guy had some nice locating equipment as well. He had some sort of radar that allowed him to see how deep a 8" water main was. He said the radar cost 9-10k.
Who clipped the corner of that overhang?
Posted via Mobile Device
Reply With Quote
 
Page generated in 0.04679 seconds with 7 queries