Thread: Nasty one
View Single Post
  #20  
Old 10-10-2012, 01:43 AM
cjohn2000's Avatar
cjohn2000 cjohn2000 is offline
LawnSite Senior Member
 
Join Date: Jun 2010
Location: Tacoma, WA
Posts: 451
Quote:
Originally Posted by muddywater View Post
clean install. why an lx over an esp since only 8 zones? future additions?
Thanks, my boss got the customer to upgrade. We have a ICORE on a residential system with three zones, because he was able to sell it. Sometimes it depends on the size of the system . The ESP LX comes in an 8 station base. I forget how many an ESP comes with base, but sometimes by the time you add in the cost of expansion modules you could have had the fancy. IMO I don't understand how you could prewire a controller unless you had a splice box and the base of the controller and you attached conduit and ran the wire so all you had to do was splice in the box, but I don't like doing work twice, if I make a mistake.
Reply With Quote
 
Page generated in 0.03471 seconds with 7 queries