Thread: Nasty one
View Single Post
  #66  
Old 10-11-2012, 07:34 PM
Mike Leary's Avatar
Mike Leary Mike Leary is online now
LawnSite Fanatic
 
Join Date: Mar 2007
Location: Winnemucca, Nevada
Posts: 20,578
Quote:
Originally Posted by Without A Drought View Post
so, in short, should i install a splice box at mrs. jones 6 zone timer just to make the wiring look pretty? prolly not.
No, of course not. However, if the client has a larger site and not the budget or the wherewithall of what the landscape will look like (and change) down the road, they should be convinced at the install that spare wire runs to the splice box are a cheap investment for the future. Sure worked for me when expansion was wanted!
Reply With Quote
 
Page generated in 0.03482 seconds with 7 queries