View Single Post
  #37  
Old 11-10-2012, 02:22 PM
Kiril Kiril is offline
LawnSite Fanatic
 
Join Date: Jun 2007
Location: District 9 CA
Posts: 18,324
Quote:
Originally Posted by txirrigation View Post
Maybe a part of this is regional, because cutting out an above ground BF is very easy. Cutting out a DCVA that is 12" deep and plumbed in with pvc, is a whole different story. Instead of a 30 min replacement your talking 2 hours, and a huge hole. All of a sudden that valve on the edge of passing looks pretty good.
Well, close enough is NOT good enough, especially in the case of a BF, and if you or anyone else thinks it is, then you deserve to be sued. Further, WTF are you doing burying a new check before you test it.

A properly installed check should take just as long to pull and replace as any other BF, be it above or below ground.
Reply With Quote
 
Page generated in 0.03849 seconds with 7 queries