|
I wish I could do 8 in a day
Right now i'm typically doing 18-20 per day which is 30 min a job. Mainly resi ranging typically from cookie cutter systems to 2 acre lots. On the bigger 15-25 zone resi systems I just start at zone 1 with the controller working forwards and then use the station master on the last zone working backwords. On neighbors I double up the systems with 1-3 min run time per zone.
I can only imagine the profit my boss is making as we are doing just about 100 jobs a day with full force of almost a month left of winterizing
|