Thread: Few recent jobs
View Single Post
  #8  
Old 11-15-2012, 07:53 PM
zedosix's Avatar
zedosix zedosix is offline
LawnSite Silver Member
 
Join Date: Feb 2003
Location: Eastern Ontario
Posts: 2,402
Quote:
Originally Posted by jbailey52 View Post
Beautiful stuff. In the second pic, dd you build the main step for lack of better words than build the steps on to it on either side, or are the steps tied in? Also what are your thoughts of steps/srw against vinyl siding?
The steps are tied in together on this one. For this job in particular we excavated to the footing, close to 9' deep. We installed 23 tons of 2" clear stone, geo textile @ the 8' mark then added 3/4" granular to just under bottom block. Up against the house we installed platton (sp) right up to the top of the brick. I suppose we could cut the siding and install J-trim, but its a chance you take if there is ever any settling.
Reply With Quote
 
Page generated in 0.03964 seconds with 7 queries