View Single Post
Old 12-07-2012, 11:03 AM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
Join Date: Aug 2005
Location: County Jail
Posts: 6,235
Originally Posted by Darryl G View Post
If he had told you it was a pre-bid meeting up front I think that would have been fine. In many businessess it's not uncommon for the customer to have a pre-bid meeting with all of the potential contractors there to present the scope of work and have a question and answer session. Competitive bids are a fact of life and getting at least 3 bids is SOP for many.

Darryl, which post are you responding to? You didn't quote it.

Never heard of a "prebid meeting" in the residential world. Most residential contractors don't even fool with "bidding". We submit a proposal with intentions of turning out a top notch product and leaving with a profit. In the commercial world they have "prebid meetings" and yes, they "bid". And the margins are much much smaller. Usually the quality is not there.

Just curious which post you're referencing?
"It's You vs. You"

"People Throw Rocks At Things That Shine"

My Equipment Brag List:

-1 CAT hat
-16 pairs of Hanes socks (the Heavy Duty model), many with holes.
-12 pairs of underwear, ranging from Joe Boxers to Jockey, many are in need of replacement. (no more photo requests please)
-hundreds of t-shirts. Some w/ grease stains, some torn & tattered.
-7 pairs of jeans, ranging from Levis to Polo to GAP. 1/2 of them have holes in 'em.
-1 belt
-1 pair of old worn out Nike shoes.
Reply With Quote
Page generated in 0.03843 seconds with 8 queries