View Single Post
  #1491  
Old 12-09-2012, 02:03 PM
Wet_Boots's Avatar
Wet_Boots Wet_Boots is offline
LawnSite Fanatic
 
Join Date: Mar 2005
Location: metro NYC
Posts: 39,052
If the POC is by the curb you are stuck with some length of field wiring. Basement meters can mean less than ten feet of control cable leading from controller to valve manifold.
Reply With Quote
 
Page generated in 0.03640 seconds with 7 queries