View Single Post
Old 12-23-2012, 08:40 PM
DVS Hardscaper's Avatar
DVS Hardscaper DVS Hardscaper is offline
LawnSite Fanatic
Join Date: Aug 2005
Location: County Jail
Posts: 6,235
Originally Posted by Stillwater View Post
Ya had to take less time otherwise we be lookin at over 5/6 grand in cutting for a average walk.
Posted via Mobile Device
Correct. The overall job was over $6500.00.

Work sold and performed Dec through Mid march are done for winter discount rates. Off the top of my head I'd say they saved around $500 maybe as much as $700 by doing the work during off peak season.

It's just like the construction of a Ryan Home vs a home built stick by stick. Always a difference in cost. And quality.
Posted via Mobile Device
Reply With Quote
Page generated in 0.03747 seconds with 8 queries