View Single Post
  #80  
Old 12-28-2012, 08:00 PM
1idejim's Avatar
1idejim 1idejim is offline
LawnSite Fanatic
 
Join Date: Jul 2009
Location: State of Jefferson
Posts: 6,892
The point of pressure testing the "irrigation mainline" is to prove or disprove the presence of a leak within the scope of the installers liability.

No leak, no problem.

Installer caused leak, Fix-it-NOW!

Meters don't lie but they don't prove or disprove the location. If you get a solid 15-30 minute test you should be fine. I use 2-5 minute tests most of the time myself.
Posted via Mobile Device
Reply With Quote
 
Page generated in 0.03453 seconds with 7 queries