schedule the run sheet

I would like to be able to arrange the run sheet in the order I want the jobs done. In gopher you can do that by arranging the route. Most of the jobs I have I do not know how long it is going to take. (I do a lot of sprinkler repair). I want the run sheet to have the jobs in the order I want so the crew finishes one and goes to the next one I have scheduled to do. But the run sheet prints out in no particular order and there is no way to re-arrange them.

Hope this helps.