View Single Post
  #15  
Old 01-16-2013, 09:57 PM
mirrorlandscapes mirrorlandscapes is offline
LawnSite Member
 
Join Date: Mar 2007
Location: Northern IL
Posts: 79
Should have been more clear. Dug out base on day 1 and had base rock in piles waiting to be installed. everything froze overnight (unless geotextile kept subbase from freezing). Broke the piles of rock up and installed unfrozen rock probably on frozen ground. never checked under geo. Tarp would have been great idea thanks i didnt think that would prevent freezing. I'll know for next time
Posted via Mobile Device
Reply With Quote
 
Page generated in 0.04026 seconds with 7 queries